Welcome to Ryanairconspares.com

Ryan Air Conditioning Spares UK


Air Conditioning Services, Tools, Refrigeration Spares, Pumps Units, UK, Europe.
Delivery Details Account Application Login New Products Contact Us Search PipeLagging.com
  Home » Ryanairconspares » Refrigeration Equipment » Cellar Cooling Systems » JE Hall Cellar Cooling Systems » JCC60E My Account  |  Cart Contents  |  Checkout   
Quick Find
 
Use keywords to find the product you are looking for.
Categories
Air Con Refrigeration Tools Air Con Refrigeration Tools
Air Con Remote Controllers Air Con Remote Controllers
Air Conditioning Cages Air Conditioning Cages
Air Conditioning Maintenance Air Conditioning Maintenance
Air Conditioning Pipe Air Conditioning Pipe
Air Conditioning Units Air Conditioning Units
Armaflex Pipe Insulation Armaflex Pipe Insulation
Automotive Air Conditioning Automotive Air Conditioning
Brackets, and Pipe Clips Brackets, and Pipe Clips
Condensate Pumps Condensate Pumps
Domestic Pipe Insulation Lagging Domestic Pipe Insulation Lagging
Electric Fans Electric Fans
Electrical Accessories Electrical Accessories
Foiled Insulation Foiled Insulation
Insulation Covering Insulation Covering
Kaimann Pipe Insulation Kaimann Pipe Insulation
Phenolic Pipe Insulation Phenolic Pipe Insulation
Pipe Insulation Coils Pipe Insulation Coils
Plastic Trunking Plastic Trunking
Plumbing Equipment Plumbing Equipment
Protective Padding Protective Padding
Refrigeration Equipment Refrigeration Equipment
  Cellar Cooling Systems Cellar Cooling Systems
    JE Hall Cellar Cooling SystemsJE Hall Cellar Cooling Systems
    Marstair Cellar Cooling SystemsMarstair Cellar Cooling Systems
  Fan Motors Fan Motors
  Line Components Line Components
  Refrigeration Air Conditioning Compressors Refrigeration Air Conditioning Compressors
  Refrigeration Controllers and Thermostats Refrigeration Controllers and Thermostats
Renewable Energy Renewable Energy
Screws Plugs and Fixings Screws Plugs and Fixings
Solar Pipework and Fittings Solar Pipework and Fittings
Steel Channel and Support Systems Steel Channel and Support Systems
Trace Heating Cable Tape Trace Heating Cable Tape
ABRU Ladders and Scaffold ABRU Ladders and Scaffold
Clearance Items Clearance Items
Manufacturers
Cooling Calculator

Calculate your cooling requirement

Information
Warranty
Terms & Conditions
Shipping & Delivery
F Gas Regulations
Calculate Your Air Conditioning
Waste Regulations
History Of Air Conditioning
About Us
Account Application Form
Air Conditioning Remote Controls
Refrigeration Parts Price List
Directions
Reasons To Have Air Conditioning
Privacy Policy
Links Page.
LG Air Conditioning Brochures
Fujitsu Air Conditioning Price List
Product Catalogues and Instructions
Returns Policy
Contact Us

Jcc60E E Series R410A Cellar Cooler System 6.13Kw
[JCC60E]

 £1,698.15 Exc
£2,037.78 Inc 


JCC60E E Series R410a Cellar Cooler System 6.13kw

Capacity: 6.13kW Cooling

Max pipe run 15m, 8m Rise.

Supply 230/1/50.

3/8 - 5/8 - 3/4 pipe.

J5LC Condensing Units are Pre-Charged for a 7.6m Pipe Run

Run Pipework in the same size as the condensing unit connection and use copper reducers at the evaporator where necessary.

JCC60E matched with J5LC28C Èö Pre Charged with 1.80kg R410a

Additional Charge Èö 50g per metre up to maximum permissible

Power to indoor, interconnecting cable 2 core + earth, 32 amp fuse rating.

Installation & Safety

a) Installation

The units making up the J & E Hall International JCC cellar cooling system must only be installed by a qualified engineer following the mandatory and local codes of practice

b) Handling

Care must be taken when the units are moved or lifted to ensure that everyone and everything is safe. When lifting equipment is used, it must be suitable and approved

c) Application

Ensure that the unit is only used for a suitable purpose / application

d) Electrical Connection

Electrical work and connections must be made by authorised electricians in accordance with mandatory regulations and local codes of practice

e) Warranty

Failure to comply with the manufacturerÈÃÍs installation instructions could affect the performance of the unit and invalidate the warranty. Warranty is also subject to the implementation of a planned service / maintenance agreement

f) General Information

?? All works must be carried out in accordance with manufacturerÈÃÍs installation and operating procedures

?? Good working practices must be followed at all times so that mechanical and electrical hazards are kept to a minimum

?? The equipment has been fitted with covers to prevent access during operation. These must be kept in place and additional guards fitted where necessary

?? The equipment must be connected to a local external electrical isolator as one is not supplied fitted to the unit. The rocker switch fitted to the indoor unit is for control isolation only.

?? Servicing and maintenance must only be carried out by a fully qualified engineer. Before any work is started, electrically isolate the units to make sure they cannot be switched on accidentally and allow sufficient time for the isolated parts to come to rest before removing panels. Electrical isolation switches MUST be labelled to show that they are off during the servicing and maintenance operations. Care must be taken not to touch components or pipework which may be hot or cold, for a period after the unit is electrically isolated.

?? After completing any tasks ensure all guards and covers are correctly refitted before restoring the power to the unit

?? The equipment has been specifically designed to run at low noise levels; but if further noise reduction is desired, sound and vibration attenuators may be required. For noise level guidance refer to technical literature, or contact the distributor for advice.

Locating & Mounting Indoor Unit

a) Location

The JCC Evaporator unit should be mounted level on a load bearing wall or ceiling. The minimum distance from the floor to the bottom of the unit should be 1.8 metres to ensure good air convection. The side inlet grilles should have a minimum clearance from obstruction of 100mm and the minimum clearance in front of the unit should be 1500mm.

b) Fixing

The evaporator should be fixed to the wall using the two off rear fixing holes or to the ceiling using the two off top fixing holes. 10mm diameter rawbolt type fixings (not supplied) with large steel washers are necessary for local load bearing of the indoor evaporator.

c) Service Connections

The refrigerant pipe connections are accessed through the left hand side panel. Cable entry is on the right hand side of the unit. A 3/4ÈÃÏ BSP drain connector is supplied with the manuals (or cable tied to the fan guard) to be site fitted to the condensate tray.

Locating & Mounting Outdoor Unit

a) Location

Install the J5LC condensing unit in such a way that hot air distributed by the unit cannot be drawn back in again causing a short circuit of hot discharge air. Allow sufficient space around the unit for maintenance. Ensure that there are no obstructions to the air flow in to or out of the unit. The location must be well ventilated so that the unit can draw in and distribute plenty of air to keep condensing temperatures down and thus maintain cooling capacity. There should be a minimum clearance of 150mm from obstructions to the air inlet at the side and rear of the condenser and at least 1000mm in front of the unit for air discharge. It is recommended that at least 500mm clearance is maintained to the service port side of the condenser to provide good access for maintenance.

b) Fixing

J & E Hall International Condensing units can be floor mounted or wall mounted using appropriate load bearing wall brackets (not supplied). In areas where noise is a particular concern, the unit can be mounted securely on anti vibration strips (not supplied).

c) Service Connections

Access to the flared refrigerant service ports and electrical cable entry is from the right hand side of the unit.

Refrigerant Pipe Connections

a) Pipe Installation

Run the suction and liquid lines in the appropriately sized refrigeration grade copper tubing as per the tables in section 2 (c). Pipework should be run in the same size as the connections on the J5LC Condensing unit.

b) Unit Connections

The outdoor condensing unit connections are terminated in male flare connections as detailed in table 2 (c). Indoor pipe connections are provided as plain copper tails that may require a reducing fitting to match the pipework size to the evaporator connection size.

c) Insulation

Use appropriate insulation tubing with a minimum 3/8ÈÃÏ thickness on both refrigerant lines.

Pressure Testing

a) Pressure Testing

Before evacuating the system it must be tested for any potential leaks. A pressure leak test should be carried out using oxygen free nitrogen (OFN). NEVER USE OXYGEN FOR PRESSURE TESTING SYSTEMS. Before starting any pressure testing, ensure the area surrounding the system is safe, inform relevant personnel and fit warning signs indicating high pressure testing. Also use correct PPE as required.

A simple procedure for testing is as follows:

1. Pressure system slowly up to 3 bar (45 psi) for 5 minutes and check for any signs of leakage.

2. Increase pressure slowly up to 10 bar (150 psi) for 5 minutes and check for any signs of leakage.

3. Increase pressure slowly up to 33 bar (500 psi) and check for any signs of leakage. Leave system under pressure for 24 hours. Listen for any possible leaks and check all joints with bubble spray. If any leaks are discovered, release pressure slowly from system until empty, repair leak and then restart pressure testing procedure. Never attempt to repair a leak on a pressurized system.

A strength test should also be incorporated according to local regulations.

Once testing has been completed satisfactorily release the pressure from the system gradually and safely to external atmosphere.

b) Evacuation

After the pressure testing has been completed, the system should be thoroughly evacuated to reduce the risk of moisture being present. It is recommended that a triple evacuation procedure is carried out as follows using a suitable vacuum pump, a torr gauge and oxygen free nitrogen (OFN):

1. Evacuate system down to 10 torr.

2. Break the vacuum with OFN to a pressure of 1 bar.

3. Evacuate the system to 5 torr.

4. Break the vacuum with OFN to a pressure of 1 bar.

5. Evacuate system a third time to 2 torr or lower if possible.

6. Isolate vacuum pump and leave system for 30 minutes and ensure vacuum is held.

Once above has been completed satisfactorily then refrigerant charge can be introduced to the system.

Electronic Controller Setup

JCC 25E & JCC 60E Èö Danfoss EKC 101

a) To check the setpoint

Press both buttons on the controller together. Set temperature is displayed.

b) To change the setpoint

Press both buttons on the controller together. Set temperature is displayed. Then press either the top button to raise the setpoint or the bottom button to lower the setpoint. Press both buttons again to save the new setpoint.

c) Manual Defrost

Press and hold the lower button for four seconds. To stop the defrost press and hold the lower button for a further four seconds.

JCC 40E & JCC 50E Èö Dixell XR 20C

a) To check the setpoint

Press and immediately release the SET key. The display will show the current set point value.

b) To change the setpoint

Press and hold the SET key for two seconds. The current setpoint value will be displayed and the Snow LED starts blinking

Press either the keys within 10 seconds to adjust the setpoint up or down.

To memorise the change press the SET key again

c) Manual Defrost

To start a manual defrost press and hold the DEF key for 2 seconds

d) To lock the Controller

Press and hold both the keys for more than three seconds. POF will appear on the controller display. It is not now possible to change the setpoint

To cancel the controller lock, press and hold the same keys for three seconds until PON is displayed. It is now possible to change the setpoint again


This product was added to our catalog on .
Reviews
Quantity:  
Shopping Cart more
3 x Pipe Insulation Lagging Cutter, Armaflex Slitting knife
1 x Air Conditioning Copper Tube Pipe 15.9mm 5/8 15m 15.9mm
2 x Schreader Copper Access Valve With Tail And Cap B001 1/4
1 x Air Conditioning Copper Tube Pipe 19.1mm 3/4 15m 19.1mm
1 x B604 3/4 Brass Flare Nut
1 x B707 1/4 Brass Male Flare Tee
1 x B601 3/8 Brass Flare Nut
1 x SY 2.50 3 Core Cable 100m
1 x BBJ Clips Aluminium Channel 3 Metres Long
1 x 35mm 1 3/8 Pipe Channel Clip Cushion Clamp
1 x 15mm 5/8 Pipe Channel Clip Cushion Clamp
1 x Smelly Jelly Air Conditioning Air Freshener Blue Mountain Fresh
1 x Aspen Peristaltic Pump Spare Replacement Tube Kit Fp1282
1 x Aspen Tank Pump Steel Wall Mounting Bracket Sa1115
2 x Gallo Gun CO2 Cartridges x 6 GGC-6
1 x Ezt-150 3/4 Waterless Condensate Water Trap Eztrap
2 x MF08 Lindapter for MetFloor 60 & Metfloor 80
1 x Plasterboard Fixing Metal
2 x Drop In Wedge Anchors Red Heads M10
1 x Cable Ties Nylon 200 X 4.8Mm Black Bag Of 100
1 x 20 Amp Isolator Switch 4 Pole Rotary
1 x Draper 69288 Plier Set 3Pc Vde Approved
1 x C60HC120 Schneider MCB, Type C, 20A, Single Pole 240 - 440V AC
1 x 25 Amp Isolator Switch 4 Pole Rotary
1 x Insulation Tape White 33M X 19Mm
1 x Insulation Tape Black 33M x 19mm
1 x B706 3/4 Brass Male Flare Fitting Connector
7 x Air Conditioning Refrigeration Install Complete Tools Set Kit
1 x Mastercool 70033 Copper Pipe Tube Pipe Cutter 1/8 to 1 1/8 O.D.
1 x Mastercool 90639 3/4 Mpt 1/4 Flare Brass Refrigerant Bottle Adap
1 x Boc Oxygen Regulator Series 8000 10 Bar 41553
1 x EcoWarrior Refrigerant Recovery Unit Aspen Pumps 220v FP2566
3 x Mastercool 90410 R410A Air Conditioning Flare Adapter 1/4 - 5/16
1 x Imperial 370-Fh Triple Head 180 Degree Tube Bender With Roto-Lok
1 x Mastercool 71700 Hydraulic Flaring and Swaging kit.
1 x Single gas cylinder trolley
1 x Boc Acetylene Regulator Series 8000 10 Bar 41554
1 x Threaded Rod Stud Cutter M6 M8 M10
1 x Draper 29807 Expert Box Of 50 300Mm 32Tpi Bi-Metal Hacksaw Blade
1 x Condenser Fin Comb Multi Head Kit Evaporator
1 x Refco 4491018 Sight Glass Assembly M4-6-11
1 x Aspen Peristaltic Compressor Sensor Condensate Pump Fp2584
1 x Aspen Pumps Column Drinks Vending Machine Mini Pump
1 x Mastercool 91490 Standard Valve Core Remover/Installer 1/4" 9149
1 x 53314 Refrigerant Dye Remover
1 x 70064 Mastercool Copper Tube Pipe Bender 1/2 Inch
£3,899.12
Currencies
We accept...
PayPal
I accept Pound Sterling payments through PayPal!
Secure Website
Secure site protected by SSL
Secure Website
Card Watch web 
site logo
Manufacturer Info
JE Hall
JE Hall Homepage
Other products
Notifications more
NotificationsNotify me of updates to Jcc60E E Series R410A Cellar Cooler System 6.13Kw
What's New? more


£103.35 Exc
£124.02 Inc
Tell A Friend
 
Tell someone you know about this product.
Reviews more
Write ReviewWrite a review on this product!

 
Copyright © 2012 RyanAirConSpares.com
eShop Setup & Hosted by Kynet Ltd